IATF 16949® Rules 6th Overview and Strategies for Ensuring Your Certification is Not Suspended

An overview of the significant changes in IATF 16949® Rules 6th Edition and strategies for maintaining certification

A revised IATF 16949® Rules 6th Edition was released on April 1, 2024 and it will impact how every IATF 16949® audit is conducted as of January 1, 2025.  The IATF 16949® Rules is a critical tool within an automotive QMS for both the certification body and the certified company. 

This article explains some of the critical concepts of the IATF® Rules 6th Edition (Rules 6), and the impact on the company’s quality management system.  You are encouraged to obtain a copy of Rules 6 and understand the many changes as a result of this new revision that affect IATF 16949® certified companies. 

Changes in Rules 6th – The Basics:

  • One of those changes addresses how the extended manufacturing site is defined. If your certification includes an extended manufacturing site, the most significant change is the requirement that the site be less than 10 miles AND less than a 60-minute drive.  If the extended manufacturing site does not meet those requirements, then the site will need to have its own certification.  Obviously, this will result in more audit time and an increase in costs.  The IATF 16949® certified company with extended manufacturing sites will need to plan accordingly and contact their certification body to arrange the new registration audit.
  • On the topic of extended manufacturing sites, with the Rules 6 changes, the site can only receive or supply support to the main manufacturing site. If your current extended manufacturing site supplies support to other than the main manufacturing site (i.e.: a warehouse that supports several sites for the organization), that extended manufacturing site will need to obtain its own IATF 16949®
  • Also included in Rules 6 is a stronger requirement concerning consultants that the company may use for their QMS activities (including internal audits). The name of the consultant will need to be supplied to the certification body during pre-audit data submittal (to ensure that the consultant is not also an auditor with that certification body). Consultants are not allowed to participate (directly or indirectly) during the certification body audit or any nonconformance closure meetings with the certification body.  The rules state that failure to meet this requirement will result in audit termination by the certification body (i.e.: certificate withdrawal),
  • Another new feature of Rules 6 is the audit cycle will now only be 12-month cycles. Prior Rules editions allowed for 6-month and 9-month cycles.  If your current audit cycle is not 12 months, the certification body will change the cycle with the 2025 audit activity. 

Knowledge. Expertise. Experience.

Outsource Your Internal Audits

Consulting Services For ISO, IATF, AS, and more

 

Changes to the IATF 16949® audits:

  • There will be changes to allowable audit duration. As before, the audit day will be 8 hours.  Although with Rules 6, the total audit duration cannot exceed 10 hours a day.  Removed is the ability to audit a longer audit day if the site had a 3-shift operation (i.e.: an audit day of 10 hours to capture the 3rd shift operation). 
  • Minimum times for nonconformance closure have been established in Rules 6. Minor nonconformance requires 0.5 to1.0 hour per finding and Major nonconformances requires 1 to 3 hours per issue (with onsite visit).  This new requirement has the potential to add significant time to the audit event.
  • Rules 6 focus on support location has been clearly defined as anywhere the process interface and process interaction exists. This is a definition that may result in locations that were previously out of the scope of certification now being included in the scope of certification.  The certified company will want to examine their support locations and ensure the QMS has included those supports.
  • Support requirements also include indirect support activities (i.e.: a support of a support). Example: an office in Milwaukee that provides customer expectations from Harley Davidson to a design center in Japan that provides the drawing to the manufacturing site in Ohio…the Milwaukee office would be an indirect support that would be part of Ohio’s certification. Milwaukee would need to be included in the audit process.
  • The pre-audit data supplied by the company to the certification body auditor has added more components and needs to be supplied to the auditor no less than 30 days before the start date of the audit. If the company does not supply management review data with the pre audit data submittal, two hours will be added before the audit starts to review the management review records.  If the pre audit data is not submitted within the required timeframe, the audit may be postponed.
  • An opening meeting with top management will start the audits to cover the verification of any changes to the pre-audit data supplied to the auditor and a review of current customer reports from the original sources (portals, emails, etc.). The company will need to ensure that top management is present for this meeting and aware of the topics being audited from the pre audit data submission.

 

Certification Body Auditor required focus of the audit:

  • Rules 6 requires the auditor to focus upon some of the following topics during the audit (using the Automotive Process Approach which means entire audit is focused on data and impact to the QMS—should not be a random audit):
    • Customer performance (quality and delivery) and actions for negative performance
    • Process description on the process map will be the auditor’s guide—the map must be accurate and correct (including supports and outsourced processes)
    • Organizational defined risks and actions
    • Problem Solving processes and resulting changes to the company (including control plan and FMEA updates)
    • Outsourced processes and controls of those processes
    • The company’s effective implementation of the PDCA and continual improvement
    • Change management
    • KPI performance and actions for negative performance
    • Support location interactions and controls

Changes to Major nonconformities:

  • Rules 6 requires major nonconformities to be submitted with all action steps (containment, root cause analysis, action plan and supporting evidence) within 15 calendar days. If not submitted, the audit is considered failed, and the certification withdrawn.
  • Also, if the auditor rejects the initial submission of the major nonconformance, the client has another 15 calendar days to obtain approval. If approval cannot be granted after 30 total calendar days, the audit is considered failed, and the certificate withdrawn.
  • The impact of a major nonconformance has grown significantly and could have a very negative impact to the company. If a major nonconformance is received during an audit event, the organization must set the highest priority in addressing the issue with an effective and acceptable corrective action.

Conclusion

The intent of this article is to highlight some significant changes to Rules 6 from an IATF 16949® certified company’s perspective.  As stated, you are encouraged to obtain a copy of Rules 6 and understand how these changes will impact your company’s IATF 16949® certification going into 2025 and beyond. IATF® has also provided a slide presentation of Rules 6th Questions and Answers for reference and clarification.  SimpleQuE is here to help you navigate these changes and provide insight that will help you and your company maintain your IATF® certification.  Contact us to learn more about the customized services offered to match your certification and training needs.

SimpleQuE is not associated with the IATF®, IAOB, ANAB®, IAQG®, and is not a certification body. SimpleQuE is an independent consulting, training, and second-party auditing service provider that assists a company on a path to obtain and maintain certification through accredited certification bodies.

Learn More About The simpleQuE Advantage

The simpleQuE Advantage Begins Here! Contact Us Today