As a wrap-up to the 2025 AIAG Quality Summit, held in October, simpleQuE IATF 16949® consultant, Paul Gambino, provides a summary of the key points which are of interest to automotive suppliers.  He attended a panel discussion led by representatives from the International Automotive Oversight Bureau (IAOB) which answered a total of eighty questions during and after the summit. Most were related to the IATF® Rules (31), upcoming IATF 16949® 2nd edition (21), the Red Supplier Program (9), IATF® Auditors (6), Customer Specific Requirements (CSR) (5), with the rest (8) covering miscellaneous topics.

Questions regarding IATF 16949® – 2nd Edition:

The IATF 16949® 2nd Edition release (planned for Q1 2027, preferably January) is expected to be aligned with the release of the ISO 9001 update (planned for September 2026) since IATF 16949® is based on ISO 9001. In the next version, the IATF® is considering combining both ISO 9001 and IATF 16949® requirements in one document, as well as creating a CSR database.  Previous sanctioned interpretations will be rolled into the new standard.  The intent is to have more than a nine-month transition period.  While the transition plans have not been finalized, including any reductions in audit days, a similar process to the roll-out of the IATF16949® 1st edition is contemplated, which will be outlined in a published transition document.

There were also several questions regarding clause 7.1.5.3.2 (and subsequent SI’s modifying it) and the need for an accreditation body mark on the calibration or test certificate from an external lab.  This area is under review, but one answer included the intent of the requirement which “is that the calibration provider is following the appropriate calibration methods and processes for the relevant measurement parameter, appropriate for the usage of the test and measurement equipment.” There are also several questions about the IAOB “wish list” item regarding adding requirements for AI use on the shop floor.  They would only say that the focus is on the use of AI for inspection.

Questions about IATF® Rules: 

Scheme Structure

Eleven questions dealt with the scheme structure.  IATF® does not allow for a campus concept like ISO/IAF but does offer a corporate scheme concept and an extended manufacturing site (EMS) concept.  Rules 6th changes reduced the maximum reduction from 45% to 15% for the former and limited the EMS to sites no more than ten (10) miles from the main site.  The IATF® made these rule changes to ensure strict oversight and ensure the integrity of the certification process, and the IATF® is not considering revisiting either change currently.

Remote Support Locations

Six questions related to remote support locations (RSL), which are non-manufacturing sites that provide one or more support functions that support (IATF®-certified) manufacturing sites.  The types of support functions are listed in Rules 6, Annex 2, but there are no definitions, which has led to inconsistent application and varying interpretations.  The IAOB is open to clarifying these support functions, but it is not yet a “formal priority at the global level.”  The answer to a question about how to conduct “remote-to-remote” auditing, such as auditing an indirect remote support location (Rules 6, section 5.5) from an RSL, suggested “that suppliers or CBs consult directly with their respective Oversight Office or Certification Body (CB) for clarification on expectations and interpretations related to remote-to-remote auditing.”  Another question asked if an RSL that was not currently on the site certificate be identified on the pre-audit documentation – the answer is yes, “all remote support locations that provide value-added activities (such as warehousing, logistics, or engineering support) to an IATF®-certified manufacturing site must be declared and evaluated during the audit planning process.”

After-market Replacement Parts

There were two questions pertaining to the eligibility and inclusion of after-market (A/M) replacement parts in the scope of an IATF 16949® audit.  There are three scenarios: 1) the organization makes only A/M parts; 2) the organization makes production and A/M parts on separate lines, or 3) the organization makes both on separate lines.  In all cases, A/M parts are within scope and must meet all requirements. A related question asked if the organization is design-responsible modified the original OEM specification for A/M parts that they also manufacture – the answer is yes, they would be considered design responsible.

There were also several questions regarding clause 7.1.5.3.2 (and subsequent SI’s modifying it) and the need for an accreditation body mark on the calibration or test certificate from an external lab.  This area is under review, but one answer included the intent of the requirement which “is that the calibration provider is following the appropriate calibration methods and processes for the relevant measurement parameter, appropriate for the usage of the test and measurement equipment.” There are also several questions about the IAOB “wish list” item regarding adding requirements for AI use on the shop floor.  They would only say that the focus is on the use of AI for inspection.

Red Supplier Program:

One answer as to the purpose of the program states “The IATF® performance complaint process is designed to uphold the integrity of the certification system and ensure that certified suppliers consistently meet the expectations of the automotive industry.”  In general, the criterion for Red Suppliers is up to the OEM.  One criterion is established by the IATF® Rules – if a special audit fails, the CB must withdraw the certificate. Only Tier 1 suppliers can be designated as Red Suppliers, but performance complaints are a tool for all tiers. Two questions dealt with delivery issues.  The concern is that there is a QMS breakdown and therefore the IATF® wants to get the CBs involved. 

IATF® Certification Body Auditors:

Several questions focused on the lack of CB auditors.  The IATF® is aware of the issue and working to improve the pass rate.  For those who might be interested in becoming a 3rd-party IATF® auditor, it was noted that you need CB sponsorship.  See IAOB.org website for details at  https://iaob.org/auditor_training. 

Customer Specific Requirements (CSRs):

The answers to the questions regarding CSRs generally recommend contacting the OEM Buyer or Supplier Quality Engineer and documenting any agreements to share with your CB auditor.

Miscellaneous Topics:

One question pertained to updated Automotive Industry Action Group (AIAG) core tools manuals – Statistical Process Control (SPC) yellow book (draft review) will start in November 2025, Measurement System Analysis (MSA) yellow book is targeted for June 2026.  Another question asked involved artificial intelligence (AI), “What consideration is being given for AI agents to digest the IATF standard without copyright violation?”  The answer provided was “Free publication of any copyright protected document through AI database searches is not an appropriate sharing of such information.  IATF® and AIAG will consider the best approach to protect such copyright protected information.”

More Questions and Answers:

Below is a sampling of the Questions submitted by attendees with Answers provided by the panel for clarification and further explanation of IATF 16949:2016 and Rules 6th.

Q:  What is the requirement to submit audit planning information to the CB auditor before the start date of the audit? What is the consequence if we don’t send it all?

A:  Audit planning information is required to be submitted to the certification body auditor no less than thirty (30) calendar days before the start date of the audit.  In the event a client does not submit the required audit planning information on time, the certification body shall consider delaying the audit.  This may result in loss of certification.  The certification body is no longer permitted to add time prior to the opening meeting to review missing client audit planning information.  Only exception is management review records.

Q:  If I’m relocating part of my manufacturing site, what is required?

A:  Relocating part of the manufacturing site from the original location to a new location is considered a site move.  The client shall notify the certification body of any imminent relocation.  The certification body will gather information to understand the extent and timeline of the relocation.  The information will determine if a new initial audit or a special audit is required.

Q:  ISO IAF rules allow for a campus concept where there are multi-sites with different physical addresses in a campus area.  Is there any consideration for IATF to allow the same approach? If not, why?

A:  While ISO/IAF rules do allow for a campus concept—where multiple sites with different physical addresses can be grouped under one certification if they operate as a single entity—IATF does not currently adopt this approach.
Instead, IATF has established two distinct models to address organizational structures which are corporate scheme concept and extended manufacturing site concept.  The reason IATF does not consider the campus model is because its existing structure already provides mechanisms to manage multi-site operations while maintaining strict oversight and traceability.

Q:  Bulk Suppliers- Has there been any more dialogue pertaining to this? Example, Coil Processing.

A:  Bulk suppliers, including those involved in processes like coil processing, are eligible for IATF 16949 certification as long as they meet the applicable requirements of the standard, particularly those related to product realization and customer-specific requirements.
As for further dialogue or developments regarding bulk suppliers, there has not been a formal update or change communicated by the IATF at this time. However, this remains an area of interest, especially as supply chain complexity grows and the role of bulk material providers becomes more critical to quality and performance.

Q:  IATF 3rd party audits are currently causing a lot of efforts for suppliers and the corporate scheme audit reduction was limited with the latest rules- can a multi-site audit approach similar to ISO 9001 be considered in the future?

A:  While ISO/IAF rules do allow for a campus concept—where multiple sites with different physical addresses can be grouped under one certification if they operate as a single entity—IATF does not currently adopt this approach.
Instead, IATF has established two distinct models to address organizational structures which are corporate scheme concept and extended manufacturing site concept.  The reason IATF does not consider the campus model is because its existing structure already provides mechanisms to manage multi-site operations while maintaining strict oversight and traceability.

Q:  Will you still get the reduction days when going through the first audit with 2nd edition?

A:  At this time, it is unknown whether audit day reductions will be permitted when transitioning from the 1st Edition to the 2nd Edition of IATF 16949. The IATF has not yet published formal guidance on this specific scenario.

Q:  Can an OEM file a performance complaint against a second tier supplier if the NC occurs for a “pass-through requirement? If it is not a pass-through, can the first tier supplier act?

A:  No.  The OEM should only file a performance complaint to their direct supplier (i.e., Tier 1 supplier).  The OEM can encourage the Tier 1 supplier to file a performance complaint against their direct supplier in the situation where it is impacting the OEM (through a pass through part).

Q:  In a corporate scheme, if a manufacturing plant’s certificate is withdrawn, how does it affect the remaining locations?

A:  In a corporate scheme, if a manufacturing site’s certificate is withdrawn, it does not automatically impact the certification status of the remaining locations within the scheme. However, the Certification Body is required to evaluate the impact of the withdrawal on the overall corporate structure. While the withdrawal is site-specific, it may trigger a broader review to ensure that the integrity of the corporate scheme is maintained.

Q:  Should a distribution center (RSL) for an IATF certified plant identify this support on their CB’s pre-audit document requirements if this plant does not list this RSL on their IATF certificate?

A:  Yes, the distribution center should be identified in the pre-audit documentation, even if it is not currently listed on the IATF certificate of the manufacturing site it supports.  According to IATF Rules 6th Edition, all remote support locations that provide value-added activities (such as warehousing, logistics, or engineering support) to an IATF-certified manufacturing site must be declared and evaluated during the audit planning process. This ensures that the CB can assess the effectiveness of the support provided and its integration into the site’s quality management system.

Q:  In surveillance audits, should auditors sample all clauses which increase audit days?

A:  In surveillance audits, auditors are not required to sample all IATF 16949 requirement, but they must cover all applicable IATF 16949 clauses over the course of the surveillance audit cycle.

Q:  Is there a limit to how many minor NCs can a supplier get in one audit to start the decertification process? I have come across two different cases with troubled sub suppliers, and when we look at their last audit results, they had 14 and 20 minor ncs but still a valid cert, no especial audits.

A:  There is no specific limit to the number of minor nonconformities (NCs) that would automatically trigger decertification under IATF Rules. However, the context and nature of the minor NCs are critical.  In cases where a supplier accumulates a high number of minor NCs (such as 14 or 20), the CB should assess whether this reflects deeper systemic problems. However, if the CB determines that the NCs are isolated, properly addressed, and do not compromise the integrity of the QMS, the certificate may remain valid. So while there’s no fixed threshold, a high number of minor NCs should prompt closer scrutiny, and the CB must justify its decision to maintain certification based on a thorough risk-based evaluation.

Q:  Is there a limit to how many minor NCs can a supplier get in one audit to start the decertification process? I have come across two different cases with troubled sub suppliers, and when we look at their last audit results, they had 14 and 20 minor ncs but still a valid cert, no especial audits.

A:  There is no specific limit to the number of minor nonconformities (NCs) that would automatically trigger decertification under IATF Rules. However, the context and nature of the minor NCs are critical.  In cases where a supplier accumulates a high number of minor NCs (such as 14 or 20), the CB should assess whether this reflects deeper systemic problems. However, if the CB determines that the NCs are isolated, properly addressed, and do not compromise the integrity of the QMS, the certificate may remain valid. So while there’s no fixed threshold, a high number of minor NCs should prompt closer scrutiny, and the CB must justify its decision to maintain certification based on a thorough risk-based evaluation.

Q:  The biggest challenge is stability. In an effort to improve, leadership/process ownership is changed frequently and systems while in place still take people to make them work…how to get to standardization through constant change is the challenge.

A:  Leadership within any organization has the responsibility to implement and drive a culture based on customer satisfaction and consistency of purpose for a long term vision to continually meet customer requirements.

Q:  How can we reduce bureaucracy in the supply chain for companies applying IATF 16949?

A:  IATF 16949 requirements are based on lessons learned and best practices to continually meet customer requirements. Following IATF 16949 “to the letter” without application of the company’s culture and vision can lead to excessive bureaucracy.  Understanding and meeting the meaning and intent of the IATF requirements can lead to a reduction of the apparent bureaucracy while improving customer satisfaction.

Q:  In the next IATF version, will you require an automated QMS in light of being able to leverage AI and the benefits of real time data and not spreadsheets?

A:  AI is one of the technology and infrastructure advances being considered in the update to IATF 16949 2nd edition.

Q:  Since delivery issues are a reason for red status and with all the supply chain disruptions, how will the next version of IATF help mitigate this area?

A:  IATF is considering how logistics best practices within the manufacturing and support location sites can improve the delivery performance issues commonly seen throughout the supply base.

Q:  Why 8.4.2.3 states “with the ultimate objective of becoming certified to this Automotive QMS Standard” when most OEMs & Tier 1s do not require this?

A:  The supplier QMS development progression (from ISO 9001 to IATF 16949 certification) has the intent of reduced risk to the customer by applying the different levels of certification requirement as appropriate.
An alternative is: buying from a supplier not certified to at least ISO 9001 requires approval from all relevant customers.

Q:  As an auditor, how do we audit environmental impact without crossing to far into iso 14001? As an auditee what is the actual expectation of documentation to demonstrate that we are considering environmental impact and sustainability?

A:  Typically, the evidence sought is that the organization has investigated applicable regulations and other environmentally focused requirements regarding the products and their manufacturing processes.  This might be disposal of waste products, use of permitted materials in the composition and manufacturing processes of the product, etc.

Q:  When an OEM updates their CSR, for example, by adding annual layouts as a requirement, and the plant responds that the requirement only applies to future products, not past ones, how should this be audited?

A:  Any discussions with the customer resulting in limitations or clarification of the customer requirements (and therefore of the QMS) should be documented and shared with the auditor as part with the planning information provided to the certification body ahead of the audit and in the opening meeting to ensure clear understanding of the scope of the audit.

Paul Gambino, is a simpleQuE consultant and auditor with more than 20 years’ experience implementing, maintaining and improving automotive quality management systems and business processes. He is also currently an ISO 9001 and IATF 16949® lead auditor for several Certification Bodies. 

If you’re searching for a consultant, our team at simpleQuE is well positioned to support your IATF 16949® and MAQMSR consulting (Minimum Automotive Quality Management System Requirements), certification, maintenance, and internal auditing needs. SimpleQuE also offers a full line-up of IATF 16949® training courses which includes AIAG and VDA Core Tools, Root Cause Analysis and Problem Solving, Requirements and Implementation.  With IATF® also putting a major focus on internal auditor competency, it is essential to have IATF 16949® Internal Auditor Training. Our IATF 16949® auditor training utilizes the process audit approach. Contact us to learn more about the customized services offered to match your certification and training needs.

SimpleQuE is not associated with the IATF®, IAOB, ANAB®, IAQG®, and is not a certification body. SimpleQuE is an independent ISO 9001 certified, consulting, training, and second-party auditing service provider that assists a company on a path for the company to obtain and maintain certification through accredited certification bodies.

 