What’s New in IATF 16949 Rules 6th Edition – A Summary of the Key Changes

IATF 16949 Rules 6th - Summary of Key Changes

Exploring the changes in IATF 16949 Rules 6th and how it differs from Rules 5th

Effective January 1, 2025, IATF® Rules 6th Edition will be replacing Rules 5th. These guidelines provide the key requirements that an organization must fulfill to achieve and maintain certification to IATF 16949®. The new Rules 6th was released in all languages at the end of March 2024, giving Certification Bodies 9 months to implement. Note that most of the Rules affect Certification Bodies, but there are KEY CHANGES impacting IATF 16949® certified companies and how audits are conducted:

Extended Manufacturing Site (Section 1.1)

  • This guidance was previously in Annex 4 in Rules 5th
  • Extended manufacturing sites (EMS) must be within 10 miles and no more than a 60-minute drive from the main manufacturing site
  • Allowance for management and support personnel to be located at the extended manufacturing site (to be more reflective of how companies operate)
    • Management personnel at the EMS must control their area of responsibility at both the main site and the EMS, not just at the EMS
    • Support personnel at the EMS must only support the EMS and/or the main site, but not other sites

Audit Cycle (Section 5.1.1)

  • 12-month surveillance cycles are mandatory (Removed 6 & 9 month surveillance intervals) and added complexity to the audit day calculations
  • Removed certificate suspension for a late surveillance audit and instead allow surveillance audits to be conducted up to 3 months late without suspension
  • If a surveillance audit cycle timing exceeds 15 months (+ 3 months), the CB will cancel the client’s certificate.
  • As in Rules 5th, if the recertification audit exceeds 3 years, the certificate is canceled, and the site must start over

Determining Audit Duration (Sections 5.2, 5.3 and 5.4)

  • Incorporated Rules 5th sanctioned interpretation # 26 adding additional audit time (4 – 8 hours) if IATF OEM quality or delivery targets are not met (section 5.2 q)
  • Added ranges in audit time for the verification of corrective actions for nonconformities (NC) to ensure the CB auditor has the appropriate amount of time for effective verification activities
    • 1 hour-3.0 hours allowed for each major (section 5.2.2)
    • 30 minutes – 1 hour allowed for each minor (section 5.2 o)
  • Permitted reduction for corporate scheme is now just 15% regardless of the number of sites (section 5.3)
  • Reduced maximum possible audit day reduction from 50% to 30% (section 5.4)
  • The minimum time to be spent auditing on the shop floor is now 30% (was one-third of the total time in Manufacturing in Rules 5th)

Knowledge. Expertise. Experience.

Outsource Your Internal Audits

Consulting Services For ISO, IATF, AS, and more

Support Functions (Section 5.5)

  • This section is much expanded over Rules 5th. All support functions (list at Annex 2), whether performed at a manufacturing site or at a standalone remote support location, must be audited and part of the certification scope. A support function is established through at least one recurring activity of a client-defined process.
  • When auditing a standalone remote support location, the process interfaces and interactions between the supported manufacturing sites and any indirect supporting locations(s) must be audited.  A note describes these indirect supporting locations as “Remote of a Remote” and specifies that they have no direct interface with the manufacturing site(s) and are not included in the site’s certification scope.
  • Product design functions must be audited every 12 months (-3/+3 months), while non-product design functions at least every 24 months (-3/+3 months).
  • Section 5.5.2 details how the interfaces between the support functions and supported sites must be carried out including confirming with the client the existence of support relationships between each support function site an all of its supporting manufacturing sites, sampling based on risk a minimum of three supported sites, if possible.
  • The audit records from previous audits of the remote support locations (a different CB may be auditing the RSLs and the manufacturing site(s)) must be used for audit planning and the certification decision. These audit reports are part of the expanded audit planning inputs from the client (see section 5.7.1).  If the RSL audit reports provided do not satisfy the requirements in 5.5.3 during the audit planning review, the audit of the manufacturing site(s) may not start until the conditions are met.  It is up to the client, in cooperation with the CB that conducted the audit of the RSL, to provide the required information. It is no longer possible for the CB to conduct its own audit of the RSL to rectify the situation (Rules 5th, 5.5 Option 1).

Audit Planning/Audit Plan (Sections 5.7, 5.7.1 & 5.7.2)

  • Organizations must confirm audit dates no less than 90 calendar days before the start date of the next regular audit to ensure CB auditor resource availability (excludes special audits)
  • Organizations must provide pre-audit planning information no less than 30 calendar days before the start date of the audit which allows the CB auditor to create an audit plan and provide it to the organization for their coordination. 
    • There are now 13 required items in Rules 6th versus only 7 in Rules 5th.
    • New items include QMS-related consultancy services, the latest RSL audit reports and NC management records, updates or revisions to customer-specific requirements, etc.
    • Some old items now have more detailed requirements. For example:  QMS documentation must meet all requirements of clause 7.5.1.1; management review “records” instead of “results”
    • The one exception is if the management review records are not provided due to confidentiality concerns (“in exceptional cases”);   the certification body shall add at least 2 hours before the start of the audit to review those records.
  • The Rules 6th goes beyond adding more time prior to the start of the audit if the planning information is not received; In the event an organization does not provide audit planning information in the required timing, the CB may delay or cancel the audit, which may result in loss of certification.

Nonconformity Management (Section 5.11)

  • Organizations must submit a response for a major NC in 15 calendar days (instead of 20) including the containment action and evidence of containment effectiveness (section 5.11.1)
  • CB has 30 calendar days from the audit closing meeting date to accept the organization’s response to a major NC or resolve any outstanding issues
  • The CB must accept the information from the 60-day response before beginning the onsite special audit.
  • Failure to submit a response to any NC within the required timing, the final audit result will be failed, the certification decision negative, and requires the CB to withdraw the certificate
  • If the special audit cannot verify the effective implementation of a major NC, including those that are 100% resolved (see 5.11.3.1, discussed below), the audit will fail and the certificate will be withdrawn (section 5.11.4)
  • If the CB decides to verify the effectiveness of minor NCs at the 90-day special audit and any of these minor NCs are found not to be effectively implemented, Rules 6th clarify that the issuance of any new major NCs as a result of ineffective implementation will not impact the original certification decision (section 5.11.5)

Nonconformity Management – 100% Resolved (Section  5.11.3.1)

  • The decision to consider a non-conformity 100% resolved will be made by the CB auditor in the fifteen (15) day response to a major NC and the sixty-day (60) for a minor NC only for exceptional circumstances where the client cannot fully implement the systemic corrective action and verify their effectiveness within ninety (90) days.  This acceptance can only be made if containment is and shall remain in place, the client presents a documented corrective action plan detailing actions, timing and responsibilities.  Note that the decision for designating an NC 100% resolved cannot be made later during the onsite verification, but only at the 15- or 60-day reviews.
  • A one-time special audit to verify the effectiveness of the correction actions that were 100% resolved must be conducted no less than 90 days prior to the next regular audit
  • 30 days prior to the one-time special audit the organization must submit updated evidence that the CA’s have been implemented and internally verified

Remote Auditing (Section 7.3)

  • The remote auditing method can be used to audit employees who normally working remotely, for surveillance of some remote support functions (Annex 2), for repeated Stage 1 readiness assessments (6.2.8), and to audit any indirect support functions at a standalone remote support location audit.
  • Remote auditing is not permitted for manufacturing sites as the technology is not yet reliable globally for effective audits of the production floor.  It can only be used for conducting surveillance audits at standalone support functions where no product or material handling occurs (see Annex 2)
  • Once every other surveillance audit of a standalone remote support location, the auditor must be onsite

Decertification Process (Section 8.0)

  • Now there are only two inputs to the decertification process
    • Performance complaints and
    • NCs issued during surveillance, recertification, or special audits
  • All performance complaints, including IATF OEM special status conditions, will be received through the IATF complaint management system (CMS)
  • The CB must decide whether or not to suspend the certificate (mandatory if there is at least one major NC) within 15 days, notify the client, and update the IATF database (DB) within an additional seven days
  • For both audit NCs and performance complaints, the CB must accept the client’s corrective action plan before conducting an onsite special audit within 90 days
  • The special audit must result in either the withdrawal of the certification if the systemic corrective action plan is not effectively implemented or reinstatement of the certification (either if the corrective action is effectively implemented or the accepted systemic corrective actions for 100% resolved NCs is progressing as planned (see section 5.11.3.1)
  • The technical reviewer must make the certification reinstatement or withdrawal decision NLT 120 days, and there is an additional seven days for the CB to update either the IATF DB or IATF CMS and notify the client

This article was written by Paul Gambino, a simpleQuE  ISO 9001 and IATF 16949® consultant and auditor with more than 20 years’ experience implementing, maintaining and improving quality management systems and business processes. 

IATF® has also provided a slide presentation of Rules 6th Questions and Answers for reference and clarification.  For more information, read our blog:  IATF 16949® Rules 6th Overview and Strategies for Ensuring Your Certification is Not Suspended.

How do you cross the finish line to become IATF®  Certified?

If you’re searching for a consultant, our team at simpleQuE is well positioned to support your IATF 16949® certification, maintenance, and internal auditing needs. SimpleQuE also offers a full line-up of IATF 16949® training courses which includes AIAG Core Tools (including the new APQP 3rd Edition and Control Plan 1st Edition), Root Cause Analysis and Problem Solving, Requirements and Implementation.  Contact us to learn more about the customized services offered to match your certification and training needs.

SimpleQuE is not associated with the IATF®, IAOB, ANAB®, IAQG®, and is not a certification body. SimpleQuE is an independent consulting, training, and second-party auditing service provider that assists a company on a path for the company to obtain and maintain certification through accredited certification bodies.

Learn More About The simpleQuE Advantage

The simpleQuE Advantage Begins Here! Contact Us Today